Net Metering Support

We Handle Your Complete Net Metering Application

Stop losing money by not exporting surplus solar power. SolarLink manages the entire LESCO, IESCO, GEPCO, and MEPCO net metering process — so you don't have to.

Your Solar System Is Generating Surplus Power You're Not Getting Paid For

Millions of Pakistani households and businesses face the same challenges every month.

Without net metering, surplus electricity your panels generate goes to waste.

The DISCO application process involves multiple departments, inspections, and paperwork.

Approvals can take months if documentation is incomplete — delaying your savings.

With SolarLink managing your application, most customers are approved in 6–10 weeks with zero paperwork headaches.

What SolarLink Handles For You — End to End

Everything handled end-to-end — from design to commissioning.

  • NEPRA license compliance review and all technical documentation preparation
  • Single-line diagram & equipment specification certificates
  • DISCO application submission — LESCO, IESCO, MEPCO, GEPCO, HESCO
  • On-site inspection coordination and DISCO liaison
  • Bi-directional meter installation follow-up and confirmation
  • Net metering agreement review and finalisation support
  • Post-approval billing query support and monitoring guidance

Your Net Metering Solar Journey — 7 Simple Steps

From your first call to your first zero bill — here's exactly what happens.

Free Consultation

Contact us — we listen to your needs and explain your options with zero pressure.

Site Survey

Our engineer visits to assess your roof, load profile, and grid connection.

Custom Proposal

You receive a detailed proposal: system size, equipment, cost, and savings estimate.

Installation

Certified technicians install your system to Pakistan's highest safety standard.

Commissioning

System is tested, calibrated, and handed over with full documentation.

Net Metering

We submit and manage your LESCO / IESCO / MEPCO net metering application end-to-end.

Enjoy Savings

Your system generates clean power — watch your bills drop month after month.

Net Metering System Options

Every system is custom-designed — these are common starting points.

Distribution Company Area Covered Typical Timeline
LESCO Lahore & surrounding districts 6–10 weeks
IESCO Islamabad & Rawalpindi 6–10 weeks
MEPCO Multan, Faisalabad, Bahawalpur region 8–12 weeks
GEPCO Gujranwala & Sialkot region 8–12 weeks

* Estimates based on average Punjab electricity tariffs. Actual savings depend on usage, location, and system type.

Real Result: Before & After

A real SolarLink customer story — no exaggerated claims.

Before Solar

Rs 45,000/mo

Monthly Electricity Bill

After SolarLink 10kW On-Grid

Rs 1,200/mo

Monthly Electricity Bill

Bahria Town Phase 6, Islamabad · 10kW On-Grid System

“SolarLink handled every step. My bi-directional meter was installed in 8 weeks.”

Only Tier-1 Equipment from Trusted Brands

We only install from globally certified manufacturers — because your investment deserves hardware that lasts 25+ years.

Growatt

On-grid & hybrid inverters

Global No.1 solar inverter brand by shipments

Canadian Solar

Tier-1 BF solar panels (580W)

25-year linear power output warranty

Fronus

Hybrid inverters & solar UPS

Trusted & widely serviced across Pakistan

Net Metering Solar — Frequently Asked Questions

Honest answers to the questions our customers ask most.

What is net metering in Pakistan?
Net metering is a NEPRA-approved policy that allows solar system owners to export surplus electricity back to the national grid (WAPDA/LESCO/IESCO etc.) and receive credits on their electricity bill. When your system generates more than you need, you effectively sell it back — reducing or eliminating your bill.
Who is eligible for net metering in Pakistan?
Any consumer with a grid-connected solar system (1kW to 1MW) is eligible for net metering in Pakistan. Residential, commercial, and industrial consumers can all apply. The system must be properly installed and inspected by a licensed solar company.
How long does the net metering approval take in Pakistan?
The net metering approval process from distribution companies (LESCO, IESCO, MEPCO, etc.) typically takes 4–12 weeks. SolarLink handles the complete application, documentation, and follow-up on your behalf.
What documents are needed for a net metering application?
Required documents include: CNIC copy, electricity bill copy, property documents, single-line diagram, equipment specifications, commissioner/notary affidavit, and inspection certificate from SolarLink. We handle all documentation for our customers.
Can I apply for net metering myself or do I need SolarLink?
You can apply independently, but working with a licensed installer like SolarLink is strongly recommended. We manage the complete process — from design approval to DISCO inspection to meter replacement — saving you months of paperwork and repeated follow-up visits.
Does net metering work with LESCO, IESCO, MEPCO, and GEPCO?
Yes. Net metering is available under all major electricity distribution companies in Pakistan including LESCO (Lahore), IESCO (Islamabad), MEPCO (Multan/Faisalabad), and GEPCO (Gujranwala). SolarLink has experience handling applications across all of these DISCOs.
What is a bi-directional meter and why do I need one?
A bi-directional meter records both the electricity you consume from the grid and the surplus electricity you export back. It replaces your standard meter and is installed by the DISCO as part of the net metering approval process. SolarLink coordinates the meter replacement on your behalf.

Every Month You Wait, You're Paying Thousands in Unnecessary Bills

Get a free, no-obligation site assessment. Our engineers visit, assess your needs, and deliver a detailed custom proposal — at no cost to you.

  • Free site survey & detailed custom proposal
  • Tier-1 equipment with manufacturer warranty
  • Net metering application handled end-to-end
  • Local offices in Lahore, Islamabad, Rawalpindi & Sargodha

Get Your Free Quote

No spam. No obligation. We typically respond within 2 hours.