Commercial Solar Installation for Businesses
Professional commercial solar systems for offices, factories, retail outlets and warehouses across Punjab & Islamabad.
Solarlink designs and installs commercial solar systems from 15kW to 100kW+ for businesses, factories, and offices across Punjab. Businesses typically save 70–90% on electricity costs, with full ROI in 3–4 years. Request a free energy audit and commercial solar proposal today.
High Electricity Bills Are Eating Your Profits
Millions of Pakistani households and businesses face the same challenges every month.
Commercial electricity tariffs in Pakistan are among the highest in South Asia.
Load-shedding disrupts operations — every outage costs your business real revenue.
Tariff increases of 155%+ in three years with further hikes already announced.
Every month without solar is a month your competitors who switched are spending less and investing more.
What SolarLink Delivers for Your Business
Everything handled end-to-end — from design to commissioning.
- Free on-site energy audit — we analyse your bills, load profile, and roof space
- Custom-designed system to maximise ROI for your specific business type
- Tier-1 commercial-grade panels and Growatt on-grid / hybrid inverters
- Industrial-strength mounting and high-capacity wiring infrastructure
- Complete net metering application for LESCO, IESCO, MEPCO & GEPCO
- Detailed ROI report showing payback period and 25-year savings projection
- Dedicated commercial support team — not a residential call centre
Your Commercial Solar Journey — 7 Simple Steps
From your first call to your first zero bill — here's exactly what happens.
Free Consultation
Contact us — we listen to your needs and explain your options with zero pressure.
Site Survey
Our engineer visits to assess your roof, load profile, and grid connection.
Custom Proposal
You receive a detailed proposal: system size, equipment, cost, and savings estimate.
Installation
Certified technicians install your system to Pakistan's highest safety standard.
Commissioning
System is tested, calibrated, and handed over with full documentation.
Net Metering
We submit and manage your LESCO / IESCO / MEPCO net metering application end-to-end.
Enjoy Savings
Your system generates clean power — watch your bills drop month after month.
Commercial System Options
Every system is custom-designed — these are common starting points.
| System Size | Best For | Est. Monthly Savings |
|---|---|---|
| 15 kW | Small office / retail unit | Rs 60,000 – Rs 80,000 |
| 30 kW | Medium business / showroom | Rs 120,000 – Rs 160,000 |
| 50 kW | Factory / large office complex | Rs 200,000 – Rs 250,000 |
| 100 kW+ | Industrial / large commercial | Custom proposal |
* Estimates based on average Punjab electricity tariffs. Actual savings depend on usage, location, and system type.
Real Result: Before & After
A real SolarLink customer story — no exaggerated claims.
Before Solar
Rs 210,000/mo
Monthly Electricity Bill
After SolarLink 30kW On-Grid
Rs 65,000/mo
Monthly Electricity Bill
Johar Town, Lahore · 30kW On-Grid System
“Our payback period was just over 3 years. The ROI has been outstanding.”
Only Tier-1 Equipment from Trusted Brands
We only install from globally certified manufacturers — because your investment deserves hardware that lasts 25+ years.
Growatt
On-grid & hybrid inverters
Global No.1 solar inverter brand by shipments
Canadian Solar
Tier-1 BF solar panels (580W)
25-year linear power output warranty
Fronus
Hybrid inverters & solar UPS
Trusted & widely serviced across Pakistan
Commercial electricity tariffs in Pakistan now exceed PKR 50–80 per unit for industrial consumers. A 50kW solar system can generate approximately 200 units per day, saving businesses over PKR 3,000,000 annually at current rates. The global average solar installation cost has fallen 90% since 2010, making commercial solar the highest-ROI energy investment available today.
Source: NEPRA; IRENA World Energy Transitions Outlook 2024
What is an On-Grid Solar System?
An on-grid (grid-tied) solar system is connected to the national electricity grid. It uses solar power during the day and draws from the grid at night. On-grid systems qualify for net metering but do not provide power during load-shedding unless paired with battery backup.
Commercial Solar — Frequently Asked Questions
Honest answers to the questions our customers ask most.
How much can a business save with solar in Pakistan?
Commercial solar systems typically reduce electricity costs by 40–70%. A business paying PKR 200,000/month can expect savings of PKR 80,000–140,000 per month after installation. The payback period for commercial systems is typically 3–5 years.
What size commercial solar system do I need?
Commercial systems range from 15kW to 100kW+ depending on your consumption. SolarLink engineers conduct a thorough energy audit of your premises to recommend a correctly sized system that maximises return on investment.
Can I get net metering for my business?
Yes. Commercial properties in Pakistan are fully eligible for net metering under NEPRA regulations. SolarLink handles the complete net metering application process for your business.
How long does commercial solar installation take?
Commercial installations typically take 3–10 days depending on system size and complexity. The full project — from survey to commissioning — takes approximately 3–6 weeks.
Is commercial solar suitable for rented business premises?
Solar can be installed on rented premises with the landlord's written consent. Many businesses negotiate this into their lease. SolarLink can advise on the legal and practical considerations for your specific situation.
What happens to business operations during installation?
SolarLink schedules commercial installations to minimise disruption — typically during off-hours or weekends. Grid power remains active throughout. A brief 1–2 hour outage is only needed for final grid connection.
How much can a business save with solar in Pakistan?
Businesses with monthly bills of PKR 100,000+ typically see savings of 70–90% after installing solar. A 25kW commercial system can save a business over PKR 1,000,000 per year, with full payback in 3–4 years.
What size solar system does a commercial building need?
Commercial solar system sizes typically range from 15kW to 100kW+, depending on energy consumption. A small office may need 15–25kW, while a factory or large commercial facility may require 50kW–500kW. Solarlink provides a free energy audit to determine the right size.
Is solar viable for businesses in Pakistan given frequent load-shedding?
Yes. A hybrid commercial solar system with battery backup provides continuous power even during load-shedding. This eliminates reliance on expensive diesel generators, reducing both fuel costs and downtime.
Does net metering apply to commercial solar systems?
Yes. Commercial solar systems qualify for net metering in Pakistan. Businesses can sell excess electricity back to WAPDA/LESCO during peak generation hours and draw from the grid at night, significantly reducing net bills.
How long does commercial solar installation take?
Commercial solar installations by Solarlink typically take 1 to 2 weeks depending on system size and site conditions. We handle all permitting, civil work, electrical work, and net metering paperwork.
Every Month You Wait, You're Paying Thousands in Unnecessary Bills
Get a free, no-obligation site assessment. Our engineers visit, assess your needs, and deliver a detailed custom proposal — at no cost to you.
- Free site survey & detailed custom proposal
- Tier-1 equipment with manufacturer warranty
- Net metering application handled end-to-end
- Local offices in Lahore, Islamabad, Rawalpindi & Sargodha
Get Your Free Quote
- Net metering for businesses Full DISCO application handled for you
- Business solar ROI Calculate payback period & 25-year savings
- View our commercial projects Real commercial installs with bill data
- Net Metering Guide NEPRA policy, eligibility & process
- Frequently Asked Questions Common commercial solar questions answered
- How Solar Works Understand on-grid and hybrid systems